Avada Car Dealer News

In the Production Control Plan, the work plan, inspection plan, parts list, and FMEA as well as photos for inspection instructions and all technical documents are recorded in one module.

Example :-
Index change: In the event of an index change, the PKP is simply copied to the new index. This prevents confusion between the old and new work plans or Inspection plans that do not match the work plan. The inspection plan index can be traced down to the batch-standard requirement of the industry.

Leave A Comment